These 2 brought the train in overnight. The extra unit is needed to get the train up to the CSX. Pretty stiff grade on the Wheeling Connection. |
Date:
10/30/2021 |
Location:
Akron, OH Map ![Show Akron on a rail map](/images/map_us.gif) |
Views:
115 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Fred Stuckmann |
Locomotives: |
Author: Fred Stuckmann
|
![WE 7009](http://s3.amazonaws.com/rrpa_photos/142502/IMG_9971.JPG) |
Picture Categories: Yard |
This picture is part of album: Z642-30 to be. |