Glenfield's 8.9 signal had short service life. It was put up about 5 years ago after the PRR Bridge was accidentally toppled by track construction work. It along with 10.7 and 6.5 came down on September 29th, 2019 |
Date:
4/25/2018 |
Location:
Glenfield, PA Map |
Views:
130 |
Collection Of:
Richard Koehler |
|
Author: Richard Koehler
|
|
Picture Categories: Signal |
This picture is part of album: The Late Great Eclectic Signals of The Fort Wayne Line |