WSOR services Leeco Steel in the Southwest Industrial Park via former MILW rails at Oshkosh, WI on 4 Apr. '18. The lead locomotive is passing the northeast end of a new pair of circus-style loading ramps. This facility was built in late-'17 to replace the single ramp at S. Washburn St. (about 2 miles to the northeast). |
Date:
4/4/2018 |
Location:
Oshkosh, WI Map |
Views:
440 |
Collection Of:
T. P. Bruss |
Locomotives: |
Author: T. P. Bruss
|
|
Picture Categories: |
This picture is part of album: Northeast WI, Spring 2018 |